• Oil pipeline Fier Albania
  • Oil pipeline Fier Albania

Oil pipeline Fier Albania

Customer
Bankers Petroleum

Description
Construction oil pipeline in Fier

Timeframe
2011

Pipeline specifications
Pipeline length: 24 km
Diameter: 6" and 12"
Wall thickness: 6 up to12 mm
Material: steel

Number of drillings significantly increased
Canadian oil producer Bankers Petroleum has won an Albanian government concession to extract oil near the city of Fier for a period of 20 years. The extracted oil used to be shipped with trucks from the production field, through Fier and on to the transhipment location in Vlore, from where oil tankers shipped it across the globe. A.Hak International, cooperating with A.Hak Drillcon, constructed a new oil pipeline from Fier to Vlore. Originally the trajectory included 5 horizontal directional drillings, but once the first drilling was completed, the customer was so enthusiastic about this method that this amount was expanded to 18 HDD’s in total, in which a river, a highway and a railroad were crossed.

Pipelines

  • 11 km 12" oil pipelines, including 8 HDD’s and 2 crossings.
  • 13 km 6" oil pipelines, including 10 HDD’s and 2 crossing.
  • Installation of 4 ‘pig’ receivers.


Worth mentioning

  • As the trajectory included a segment which had to be crossed with soil contaminated by a factory, A.Hak consulted the customer to circumvent this terrain using a horizontal directional drilling. Another segment of the trajectory included a highway. To prevent consequential damage and traffic nuisance, the same decision was made to carry out a HDD.
  • The 12" oil pipeline is a pre-insulated pipeline used for transporting heated oil while limiting heat loss. A.Hak has significant experience in this expertise based on the construction of district heating networks.
  • news

    River crossings TAP River crossings TAP

    River crossings TAP

    A.Hak is proud of its own equipment that is used in the construction of underground infrastructure all over the world. Our machines demand a leading role on film material from the TAP project.

  • news

    TBM Mary is halfway her journey TBM Mary is halfway her journey

    TBM Mary is halfway her journey

    Mary, National Grid’s 510 tonne tunnel boring machine, is now halfway through her 5 km journey under the River Humber.

  • news

    Winner ISTT No-Dig Award 2016 Winner ISTT No-Dig Award 2016

    Winner ISTT No-Dig Award 2016

    A.Hak Leidingbouw wins ISTT No Dig Annual Award 2016 in the category for Project Rehabilitation with the Unique pipe-in-pipe project for NAM.

  • news

    Digital collaboration with grid operators Digital collaboration with grid operators

    Digital collaboration with grid operators

    A.Hak's IT/IM department and client Alliander contributed significantly to the development of the Digital Collaborative Platform.