• news

    Successful drilling Alkmaar Heat Network Successful drilling Alkmaar Heat Network

    Successful drilling Alkmaar Heat Network

    As part of the construction of the Alkmaar Heat Network, A.Hak performed a successful drilling under the Westtangent in Heerhugowaard on Tuesday, April 17th.

  • news

    Beautiful images of TAP Albania Beautiful images of TAP Albania

    Beautiful images of TAP Albania

    When you build a pipeline in the rugged, mountainous landscape of Albania, it should yield beautiful images. The film and photo material of TAP (Trans Adriatic Pipeline) proves just that.

  • news

    A.Hak wins Tytan Award 2017 A.Hak wins Tytan Award 2017

    A.Hak wins Tytan Award 2017

    A.Hak Leidingbouw won the Tytan Award 2017 with the rehabilitation of a production water pipeline by means of a trenchless pipe-in-pipe method for client Nederlandse Aardolie Maatschappij BV (NAM).

  • projects

    Oil pipeline Fier Albania Oil pipeline Fier Albania

    Oil pipeline Fier Albania

    A.Hak International partnered up with A.Hak Drillcon to built an oil pipeline between the Albanian places Fier and Vlore. This job required 18 HDD drillings.