• Beautiful images of TAP Albania

Beautiful images of TAP Albania

18 April 2018

Together with Spiecapag, A.Hak International is building the Albanian segment of the 48" Trans Adriatic Pipeline. This part of the pipeline is 215 km long, about a quarter of the total length of 878 km. The gas transport pipeline starts at the border between Greece and Turkey, where it connects to the Trans Anatolian Pipeline (TANAP). From there it goes to the coast of Albania and then to the Adriatic coast in Italy via an offshore pipeline.

Client TAP AG regularly publishes beautiful film material on its website, including these two time-lapse films:
The entire construction process in a nutshell
Construction work in the Korça region


There are many more films and photos in TAP's media library.

  • news

    One million man hours without LTIs One million man hours without LTIs

    One million man hours without LTIs

    A.Hak is working on the construction of a pipeline for Saudi Aramco in the Kingdom of Saudi-Arabia. This week the million man hour mark was reached without a single LTI (lost time incident).

  • news

    Successful drilling Alkmaar Heat Network Successful drilling Alkmaar Heat Network

    Successful drilling Alkmaar Heat Network

    As part of the construction of the Alkmaar Heat Network, A.Hak performed a successful drilling under the Westtangent in Heerhugowaard on Tuesday, April 17th.

  • projects

  • projects

    Oil pipeline Fier Albania Oil pipeline Fier Albania

    Oil pipeline Fier Albania

    A.Hak International partnered up with A.Hak Drillcon to built an oil pipeline between the Albanian places Fier and Vlore. This job required 18 HDD drillings.