• A.Hak implements Forward Integration

A.Hak implements Forward Integration

26 July 2017

The introduction of Forward Integration for Contractors (abbreviated in Dutch as VIA), changes the way in which projects for Dutch gas giant Gasunie are carried out. The most significant change VIA will cause is that contractors will be responsible for environment management (permits in particular), detailed engineering and the actual execution of all construction tasks.

To maintain manageability and transparency for the larger responsibility granted to the contractor, procedures and quality systems become more important. In the start-up phase of the VIA implementation, much time is therefore spent on the quality of these systems and their interdependence.

Switching to this new work method implies a learning curve for both the customer and the contractor. The contractors selected by Gasunie in a framework agreement will coordinate this process with a VIA team and an implementation manager. The Summer edition of A.Hak Magazine features an interview with A.Hak’s VIA implementation manager Margret Sneek.

  • news

    Drone images River Humber Gas Pipeline Replacement Project Drone images River Humber Gas Pipeline Replacement Project

    Drone images River Humber Gas Pipeline Replacement Project

    Watch the site of the River Humber Gas Pipeline Replacement Project from above.

  • news

    Beautiful images of TAP Albania Beautiful images of TAP Albania

    Beautiful images of TAP Albania

    When you build a pipeline in the rugged, mountainous landscape of Albania, it should yield beautiful images. The film and photo material of TAP (Trans Adriatic Pipeline) proves just that.

  • news

    Technical challenges River Humber pipeline replacement Technical challenges River Humber pipeline replacement

    Technical challenges River Humber pipeline replacement

    An article in Ground Engineering talks extensively about the technical challenges of the River Humber pipeline replacement project. ‘The longest tunnel of its kind in the world.’

  • projects

    Bergermeer Gas storage facility Bergermeer Gas storage facility

    Bergermeer Gas storage facility

    For the construction of the largest underground gas storage facility in Western Europe A.Hak Leidingbouw constructed eight pipelines. The combined length of the tubing was 37.5 kilometers.