• News

News

  • Drone images River Humber Gas Pipeline Replacement Project

    Drone images River Humber Gas Pipeline Replacement Project

    Watch the site of the River Humber Gas Pipeline Replacement Project from above.

    » Continue reading
  • CSS: Humber project scores exceptionally

    CSS: Humber project scores exceptionally

    The Considerate Constructors Scheme (CSS) has audited the A.Hak, Skanska and PORR joint venture that works on the River Humber Gas Pipeline Replacement Project for National Grid (UK). The project scored 44 out of 50 points.

    » Continue reading
  • Infranet East ‘best contractor’

    Infranet East ‘best contractor’

    According to customer Liander, A.Hak Infranet region East was the best-performing contractor in the fourth quarter of 2017. Region manager Egon Teunissen is very pleased with the result achieved: ‘Wonderful! This is what we strive for.’

    » Continue reading
  • Technical challenges River Humber pipeline replacement

    Technical challenges River Humber pipeline replacement

    An article in Ground Engineering talks extensively about the technical challenges of the River Humber pipeline replacement project. ‘The longest tunnel of its kind in the world.’

    » Continue reading
  • Successful drilling Alkmaar Heat Network

    Successful drilling Alkmaar Heat Network

    As part of the construction of the Alkmaar Heat Network, A.Hak performed a successful drilling under the Westtangent in Heerhugowaard on Tuesday, April 17th.

    » Continue reading
  • Beautiful images of TAP Albania

    Beautiful images of TAP Albania

    When you build a pipeline in the rugged, mountainous landscape of Albania, it should yield beautiful images. The film and photo material of TAP (Trans Adriatic Pipeline) proves just that.

    » Continue reading
  • Outstanding result in KSA

    Outstanding result in KSA

    The Khurais Seawater Pipeline Project has been successfully completed. In a written statement, client Saudi Aramco characterizes our contribution to the project as outstanding.

    » Continue reading
  • Privacy Statement updated

    Privacy Statement updated

    With effect from 1 April 2018, A.Hak applies a new Privacy Statement that is in accordance with the General Data Protection Regulation (GDPR).

    » Continue reading
  • Sitech Services acquires MCL

    Sitech Services acquires MCL

    Sitech Services from Geleen acquired Mechanical Contracting Limburg (MCL) from A.Hak on March 15, 2018. No jobs were lost when the company was taken over.

    » Continue reading
  • CEO Iain Light retires

    CEO Iain Light retires

    » Continue reading
  • news

    A.Hak wins Tytan Award 2017 A.Hak wins Tytan Award 2017

    A.Hak wins Tytan Award 2017

    A.Hak Leidingbouw won the Tytan Award 2017 with the rehabilitation of a production water pipeline by means of a trenchless pipe-in-pipe method for client Nederlandse Aardolie Maatschappij BV (NAM).

  • news

    Outstanding result in KSA Outstanding result in KSA

    Outstanding result in KSA

    The Khurais Seawater Pipeline Project has been successfully completed. In a written statement, client Saudi Aramco characterizes our contribution to the project as outstanding.

  • news

    Drone images River Humber Gas Pipeline Replacement Project Drone images River Humber Gas Pipeline Replacement Project

    Drone images River Humber Gas Pipeline Replacement Project

    Watch the site of the River Humber Gas Pipeline Replacement Project from above.

  • projects

    North-South Route North-South Route

    North-South Route

    For the realization of the North-South Route, a major expansion of Gasunie's gas transport network in the Netherlands, we constructed many kilometers of natural gas pipelines and worked on several compressor stations.